- Home
- Catalog & Handbook
- Home
- Catalogs
- 2026 - 2027 College Catalog and Student Handbook
- Programs
- NCCER Plumbing and Pipefitting Technology
NCCER Plumbing and Pipefitting Technology (PT32) Diploma
The Plumbing and Pipefitting Technology program of study is a sequence of courses that prepares students for careers in plumbing, pipefitting, and related fields. Learning opportunities develop academic, technical, and professional knowledge and skills required for job acquisition, retention, and advancement. The program emphasis a combination of plumbing and pipefitting theory and practical application necessary for successful employment. Program graduates receive a Plumbing and Pipefitting Technology diploma and have the qualification of an apprentice plumber or pipefitter.
| Basic Skills | 9 |
|---|---|
| ENGL 1010Fundamentals of English I
Emphasizes the development and improvement of written and oral communication abilities. Topics include analysis of writing, applied grammar and writing skills, editing and proofreading skills, research skills, and oral communication skills. |
3 |
| MATH 1012Foundations of Mathematics
Emphasizes the application of basic mathematical skills used in the solution of occupational and technical problems. Topics include fractions decimals percents ratios and proportions measurement and conversion formula manipulation technical applications and basic statistics. |
3 |
| Social Science Elective | 3 |
| EMPL 1000Interpersonal Relat & Prof Dev
Emphasizes human relations and professional development in today's rapidly changing world that prepares students for living and working in a complex society. Topics include human relations skills, job acquisition skills and communication, job retention skills, job advancement skills, professional image skills, personal finance, problem solving, and diversity. |
2 |
| PSYC 1010Basic Psychology
Presents basic concepts within the field of psychology and their application to everyday human behavior thinking and emotion. Emphasis is placed on students understanding basic psychological principles and their application within the context of family work and social interactions. Topics include an overview of psychology as a science the nervous and sensory systems learning and memory motivation and emotion intelligence lifespan development personality psychological disorders and their treatment stress and health and social psychology. |
3 |
| Occupational Courses | 4 |
|---|---|
| COFC 1080Construction Trades Core
This course introduces the student to the basic fundamentals of the construction trades. Topics include Basic Safety, Construction Math, Hand and Power Tools, Construction Drawings, Rigging, Materials Handling, and Job-Site Communication and Work Ethic Skills. |
4 |
| Occupational Specialization - Plumbing Track (Choose one Specialization) | 33 |
|---|---|
| PLBG 1005Plumbing Fundamentals I | 4 |
| PLBG 1015Plumbing Fundamentals II
This course continues the introduction of basic plumbing concepts and practices. Topics include plastic pipe, copper tube, cast-iron and steel pipe and fittings, plumbing fixtures, DWV systems, and water distribution systems. |
4 |
| PLBG 1025Intermediate Plumbing I | 4 |
| PLBG 1035Intermediate Plumbing II
This course introduces the student to more advanced plumbing applications and techniques. Topics include water supply piping, valves, fixtures, water heaters, basic electrical principles, fuel gas, and fuel oil. |
4 |
| PLBG 1045Advanced Plumbing Concepts I
This course builds upon the basic and intermediate plumbing courses. Topics include applied math, sizing water supply piping, potable water treatment, backflow preventers, and types of venting. |
4 |
| PLBG 1055Advanced Plumbing Concepts II
This course builds upon all preceding plumbing courses, but adds in business practices. Topics include sizing DWV and storm systems, sewage and sump pumps, corrosive-resistant waste pipe, compressed air, and servicing piping systems, fixtures, and appliances. |
3 |
| PLBG 1065Specialty Plumbing App I
This course discusses specialty plumbing applications and systems. Topics include business principles for plumbers, crew leader skills, water pressure booster and recirculation systems, indirect and special waste, hydronic and solar heating systems, and plumbing codes. |
4 |
| PLBG 1068Specialty Plumbing App II
This course discusses specialty plumbing applications and systems. Topics include private water supply well systems, private waste disposal systems, swimming pools and hot tubs, plumbing for mobile homes and travel trailers, and medical gas and vacuum systems. |
3 |
| Plumbing Elective | 3 |
| COFC 1050Construction Print Reading Fundamentals
This course introduces the reading and interpretation of prints and architectural drawings for all of the construction trades. Topics include types of plans, scales, specifications, conventions, and schedules. |
3 |
| PLBG 1330Plumbing Codes
This course provides an introduction to the plumbing codes for local, national, and international applications. Topics include the history, purpose, and construction of codes, model and international codes, local codes and amendments, and code applications. |
3 |
| Occupational Specialization - Pipefitting Track (Choose one Specialization) | 34 |
|---|---|
| PPFT 1010Intro to Industrial Pipefitting
Provides an introduction into pipefitting with an emphasis on basic pipefitting tools and equipment. Topics include an overall orientation of the industrial pipefitting trade, proper use of hand and power tools, use of oxyfuel cutting, types of ladders and safe usage and identifying motorized equipment. Labs reinforce safety, appropriate use of hand tools, power tools, oxyfuel cutting equipment, proper inspection and setup of ladders, and motorized equipment to include prestart checks of operation. |
3 |
| PPFT 1020Pipe Systems Install and Assembly
Provides instruction of various pipe systems, interpret pipe layout diagrams, mathematical specifications for connections. Topics include: various pipe systems and materials; components and specifications for installation; blueprint drawings and detail sheets of specifications; valve installation and operations; mathematical precision for measurement and problem solving, and assembly requirements for threaded pipe fabrication. Labs will demonstrate proficient interpretation of blueprints, installation and assembly of pipe systems to include valve installation and threaded pipe fabrication while choosing appropriate materials for installation. |
3 |
| PPFT 1030Socket and Butt Weld Pipe Fabtication
Provides instruction on socket and butt weld pipe fabrication and instruction on excavations and underground pipe installation. Topics include: types of sockets, weld and butt weld materials, pipe length determination between socket weld and butt weld fittings, prep and assembly requirements, selection and installation of backing rings, alignment procedures, OSHA standards for shoring materials, shoring systems, hydraulic vertical shore installation, determination of sewer line fall, trenching grade and elevation, backfilling procedures, identification of underground piping materials, classification and installation procedures, and horizontal directional drilling. Labs will demonstrate ability to fabricate socket and butt weld fittings to pipe, proper installation of backing rings, vertical shoring, proper trenching techniques grade elevation of sewer line and backfilling, and use of various types of material for underground piping. |
4 |
| PPFT 1040Equipment-Slings and Crane Rig
Provides instruction on types of rigging equipment, slings and sling angles, use of rigging equipment, rigging crane practices including hazard and safety procedures, load charts and load balancing rigging and lift plan for pipes, standards and codes, conversion tables and right angle trigonometry, application and safety requirements for drain cleaners, man lifts, and cable lifts, and introduction to aboveground pipe installation including components, pipe sleeve installation and floor penetrations. Labs will demonstrate ability to perform safety inspections on rigging equipment and slings, proficient use of rigging equipment including setup, inspection and knot tying, crane operations including hand signaling and proper rigging for pipe lifts, proficient use of equivalents table, right angle trigonometry and ability to calculate takeouts using trigonometry, inspect scissor-type and telescoping boom manlifts, and proper storage of pipe and materials, fabrication of gaskets, flange bolt hole pipe installation and proficiency in floor penetrations and pipe sleeve installation. |
3 |
| PPFT 1050Testing Procedures
Provides instruction on field run specifications, erection equipment specifications, support needs, explanation on how to identify, select, and install pipe hangers and supports, spring can supports, and testing of pipes systems. Topics include: pretest, service flow test, head pressure test, hydrostatic test, and steam blow tests. Labs will focus on proficiency in the procedures for testing of pipe systems including setting up a secure work area, fabrication, erection of vessel trim, installation of concrete fasteners, angle iron bracket fabrication, use of spring can supports, and successful demonstration of pretest requirements, flow test, head pressure test and hydrostatic test. |
3 |
| PPFT 1060Advanced Pipe Fabrication
Provides instruction on advanced blueprint reading and advanced pipe fabrication. Topics include symbols and abbreviation on pipe and instrumentation drawings (P&IDs), piping arrangement drawings, ISOs, and spooling sheets, isometric drawings in plan view. Labs focus on proficiency in advanced pipe fabrication using table of ordinates or calculator to create mitered bends, laterals, wyes, ninety-degree intersections and specialty bends and intersections. Labs will also demonstrate ability to draw isometric drawings. |
4 |
| PPFT 1070Special Piping
Provides instruction related to alignment, steam traps, in-line devices, special piping, hot taps, valve maintenance, and supervisory roles. Topics include various terms, thermal expansion, anchors and cold springing, procedures for stressrelief, grouting, types of misalignments, types of steam traps, various types of in-line specialty devices, purpose and function, assembling pipes made from different materials, methods of assembly, brazing, soldering, use of compression and flared fittings and use of grooved and compression formed methods, hot tap safety and hazards, types of hot taps, valve maintenance, packing and O-rings, troubleshooting, and supervisory roles including cultural differences, genderbased social behavior, legal and ethical situations. Labs will demonstrate proficient flange alignment, proper troubleshooting of steam traps, assembly of copper and plastic tubing, solder and braze joint techniques using copper tubing, use of glass-lined pipe, install grooved pipe coupling, removal and installation of threaded and flanged valves, replacement of O-rings and bonnet gaskets, and proper repacking of a valve. |
4 |
| Plumbing Cluster (Choose ONE Cluster) | 8 |
| PLBG 1005Plumbing Fundamentals I | 4 |
| PLBG 1015Plumbing Fundamentals II
This course continues the introduction of basic plumbing concepts and practices. Topics include plastic pipe, copper tube, cast-iron and steel pipe and fittings, plumbing fixtures, DWV systems, and water distribution systems. |
4 |
| Welding Cluster I (Choose ONE Cluster) | 7 |
| WELD 1005Welding and Cutting Fundamentals
This course introduces the student to basic welding and cutting techniques. Topics include welding safety, Oxyfuel cutting, Plasma Arc cutting, Air Carbon Arc cutting and gouging, base metal preparation, and weld quality requirements. This course aligns with select modules found in NCCER Levels I and II welding curricula. |
3 |
| WELD 1035Gas Metal and Flux-Cored Arc
This course covers the fundamentals of Gas Metal Arc Welding (GMAW) and Flus Cored Arc Welding (FCAW). Topics include Equipment and filler metals and plate welding. This course aligns with select modules found in NCCER Level II welding curricula. |
4 |
| Welding Cluster II (Choose ONE Cluster) | 7 |
| WELD 1007Welding Technology Fundamental
This course introduces the student to basic welding and cutting techniques. Topics include welding safety, Oxyfuel cutting, Plasma Arc cutting, Air Carbon Arc cutting and gouging, base metal preparation, and weld quality requirements. |
3 |
| WELD 1037GMAW and FCAW Welding
This course covers the fundamentals of Gas Metal Arc Welding (GMAW) and Flus Cored Arc Welding (FCAW). Topics include welding symbols and print reading, metal characteristics, pre-heating and post-heating of metals, equipment and filler metals, and plate welding. |
4 |
Up one level
Programs of Study
Notice and Responsibilities Regarding this Catalog
The statements set forth in this catalog are for informational purposes only and should not be construed as the basis of a contract between a student and this institution. While every effort has been made to ensure the accuracy of the material stated herein, we reserve the right to change any provision listed in the catalog, including, but not limited to, entrance requirements and admissions procedures, academic requirements for graduation, and various fees and charges without actual notice to individual students. Every effort will be made to keep students advised of such changes.
- Table of Contents
- Message from the President
- Campus Information
- Academic Calendar
- College Accreditation Status
- Guarantee/ Warranty Statement
- Statement of Equal Opportunity
- Statement of Non-Discrimination
- Mission, Vision, & Values
- STEM Initiatives
- Adult Education Programs
- Admissions
- Tuition & Fees
- Financial Aid
- Student Affairs
- Student Conduct, Rights, and Responsibilities
- Graduation Requirements
- Student Grievance Procedures
- Grading System/Grade Symbols
- Program-Specific Policies
- Faculty
- Areas of Study
- Programs
- Courses